China Suppliers Factory TC315 1524mm Guide Sheave Assembly for Crown Block Systems
Third party witness and inspection report available: Bureau Veritas (BV), CCS, ABS, SGS etc.
Designed with full compatibility for BOMCO, LSNOV, and similar manufacturer assemblies, enabling direct replacement and minimized rig downtime.
The alloy steel main body provides excellent wear resistance, fatigue strength, and ease of repair through forging-welding.
Mandatory MPI and UT ensure each unit meets stringent structural and safety criteria, reducing risks in field operations.
Manufactured under API Spec 8C licensing, meeting material traceability, grooving, and inspection requirements. Our API 8C certificate number: 8C-0349.
The groove diameter (38 mm) matches the drilling line, avoiding excessive friction or wear, while optimizing line support and longevity.
Contact for more details about the Guide (Deadline) Sheave Assembly which used for HONGHUA, RG, RONGSHENG, EMSCO, LSNOV.
Q: Which drilling systems is this sheave assembly compatible with?
A: The Deadline Sheave Assembly / Guide Sheave Assembly is designed for use on Drilling TC315 Crown blocks. It features full OEM interchangeability and compatibility with BOMCO, LSNOV, HONGHUA, RG, RONGSHENG, and EMSCO assemblies.
Q: What materials are used to manufacture the sheave assembly?
A: The main sheave body is constructed from high-quality 45# Alloy Steel (AISI 1045 / JIS S45C), selected for its exceptional toughness, wear resistance, fatigue strength, and ease of repair through forging-welding.
Q: What quality standards and certifications does the assembly meet?
A: All manufacturing processes strictly adhere to API Spec 8C standards. Our facility holds the API 8C license under certificate number 8C-0349, ensuring complete material traceability and precise groove sizing.
Q: What non-destructive testing (NDT) is performed?
A: Before delivery, each unit undergoes mandatory and rigorous Non-Destructive Evaluation (NDE) protocols, including full Magnetic Particle Inspection (MPI) and Ultrasonic Testing (UT) on all welds and sheave surfaces to ensure structural integrity.
Q: What is the expected service life and temperature range of the sheave?
A: Under normal drilling conditions, the sheave assembly has a service life of 8 to 10 years, provided periodic bearing and groove maintenance is conducted. It is rated for operating temperatures ranging from -40°C to 120°C.
Q: Are third-party inspection reports available for these assemblies?
A: Yes, we provide third-party witness and inspection reports from recognized global classification and inspection agencies, including Bureau Veritas (BV), CCS, ABS, and SGS.

